The customer in Brimington had already paid for several repairs to the flat roof on her dormer extension, and it was still letting water in. She came to us expecting to be told she needed a new roof.

Our survey found why the repairs had not held. The dormer roof had been built in two different coverings, felt on one part and rubber on the other, sitting at two different heights. The joint between them had never been finished off properly, so water was getting in there and around the chimney stack.

Water ponding on the old flat roof beside the chimney stack
Before: water standing on the old roof right beside the chimney

Why another repair was not the answer

The leaks were coming from how the roof had been put together, not from wear. Another patch over the joint would have been the same repair she had already bought. The lasting fix was to take out the weak points altogether: one roof, one covering, and no chimney standing in the middle of it.

The old dormer flat roof in two coverings with the chimney stack standing in it
Before: two coverings at two heights, with the chimney in the middle

What we did

  • Took the chimney stack down to below roof height and packed the void with mineral wool insulation
  • Built a new flat roof at the existing fall and carried it across to the party wall with the neighbouring roof
  • Laid an EPDM rubber roofing system, in one continuous piece where possible, so there are no joints across the roof
  • Finished and sealed the junction with the neighbour's roof, with new leadwork where it was needed
  • Scaffolded the job for safe access and cleared all the waste from site

More photos

EPDM rubber flat roof laid along the dormer in Brimington, where it meets the tiled main roof
Finished edge trim on the new EPDM dormer roof above the dormer windows